PV power plant project development and management services:

1. Establishment of the Bulgarian company which will hold the investment and operate the power plant.

2. Obtaining a official statement from the utility-company for the conditions for connection to the utility grid.

3. Selecting and acquisition of the project land (with the optimal solar irradiation characteristics and the required communications).

4. Change of the status of the land with status “for energy production”.

5. Regulating the project site.

6. Obtaining planning permit.

7. Signing preliminary contract for sale of energy with the utility company.

8. Obtaining ecology compliance permit.

9. Technical planning of the solar power plant.

10. Obtaining construction permit.

11. Supplying the equipment.

12. Preparatory works on the site.

13. Installation works.

14. Connection to the utility grid.

15. 72 hour testing.

16. Signing the final contract for sale of energy.

17. Organizing the maintenance and the operation of the solar power plant.

Project realization period: 10-12 months.

 